I kind of thought that getting the engine back in was a major hurdle, and it was, but it was only the beginning of the real work.
I was pretty careful about labeling wires and such as i was dis-assembling it but I guess I got a little careless when it came to the air boxes. Who knew air filters could be so complicated.
I mean when I pulled out the box with the air boxes, I looked at all that junk and thought "how in the h--- is all that going to fit back in that space."
Anyway, I worked for about 4 hours (that equalled about 4 quarts of sweat 'cause it was really hot today) and I got about 1/2 the wiring and cables reconnected, the engine firmly mounted, the chain on and tension set, and one side of the air filter system reinstalled. And I hate to admit it but I'm pretty sure I spent at least 1/4 of that time figuring out the puzzle of the air boxes, and only got one side done.
I would have thought otherwise before today but based on the progress (or lack of progress) I made today I'm guessing at least 8 hours maybe more involved before I get to the big pay-off, but I am making progress and I'm a lot closer than I was last week at this time so on the whole I'd have to say it it's really going pretty well.


